Since the construction of the Columbia & Port Deposit Railroad in 1877 trains have operated through Safe Harbor, where the Conestoga River joins the Susquehanna. When construction of the A&S began in 1902 the route was planned to diverge from the Port Road six miles north at Creswell beginning a gentle climb out of the Susquehanna Valley. The first formidable obstacles the PRR would encounter on the new alignment would be the approach and spanning of the Conestoga River Valley. Beginning excavation in 1903 contractor H. S. Kerbaugh converted a former rolling mill in Safe Harbor to provide compressed air to drill pilot holes for blasting in the rock face high above. The dynamite would be hoisted up the cliffs by hand, detonated and the process was repeated. The resulting debris caused the Port Road below to be closed for extended periods of time due to the dangerous conditions, which often buried the right of way.

Blasting to create the new A&S alignment approaching Safe Harbor. Collection of the Columbia Historic Preservation Society, Columbia, PA.

Blasting to create the new A&S alignment approaching Safe Harbor. Collection of the Columbia Historic Preservation Society, Columbia, PA.

Perhaps one of the more dramatic locations on the PRR, the new A&S Bridge would stretch 1560’ in length at roughly 100’ higher than the Port Road below. While construction was underway on the new span a flood in 1904 would destroy the Port Road Bridge. Taking advantage of the ongoing construction, engineers decided to incorporate a new crossing on the Port Road, rather than rebuild the existing stone arch bridge. The new span would provide a stronger bridge for the growing freight traffic with the added benefit of increased clearance from the Conestoga River below.

Rare view of the original Columbia and Port Deposit Bridge spanning the Conestoga River. This bridge was destroyed by floods in 1904 during the construction of the A&S bridge. It was decided to replace it with a new span rather than rebuild the remains of the stone bridge. Collection of the Lancaster County Historical Society

Rare view of the original Columbia and Port Deposit Bridge spanning the Conestoga River. This bridge was destroyed by floods in 1904 during the construction of the A&S bridge. It was decided to replace it with a new span rather than rebuild the remains of the stone bridge. Collection of the Lancaster County Historical Society

Chief Engineer, William H. Brown would design the bridges utilizing different style spans to meet the specific needs of each route. The A&S bridge, much longer in length included a 300’ pin connected Pratt deck truss over the river supplemented by plate girder viaducts on steel bents - nine spans measuring 480’ to the north and seventeen spans to south measuring 780’. The bridge would carry two main tracks at height of almost 150 above the creek. Down below on the Port Road, the new bridge would feature 3 riveted deck plate girder spans carrying the two main tracks at a height of 55’ above the 1905 water line.

Construction progresses as contractor H. S. Kerbaugh begins the southern approach viaducts. Once the steel erection is complete workers could begin working below on the Port Road bridge. Collection of the Columbia Historic Preservation Society, Columbia, PA.

Construction progresses as contractor H. S. Kerbaugh begins the southern approach viaducts. Once the steel erection is complete workers could begin working below on the Port Road bridge. Collection of the Columbia Historic Preservation Society, Columbia, PA.

The steel work for the bridge was fabricated in Steelton by PRR owned subsidiary Pennsylvania Steel and was erected by contractor H.S. Kerbaugh Inc. who had been one of two key contractors during the A&S project. The construction of the masonry piers and retaining walls was unique in that the upper and lower spans shared a monolithic L shaped pier on either side of the river. The piers for the main A&S span went up as the falsework was constructed to support the new 300’ Pratt deck truss, once this was completed, assembly of the approach viaducts proceeded, the northern first then the southern approach. When the majority of the high level erection was completed, contractors could commence work on the lower level Port Road bridge. By July of 1906, trains were running on the A&S and the Port Road, which had suffered from months of closure and restriction due to the construction, would finally resume normal operations later that year in August.

Modern view of the Safe harbor Hydro-electric power plant during an approaching storm.

Modern view of the Safe harbor Hydro-electric power plant during an approaching storm.

In 1930 construction would commence to build the northern most of three Depression Era hydroelectric dams along the Susquehanna River at Safe Harbor. Erected just above the confluence of the Conestoga River the first turbine went online in December of 1931 and by 1940 a total of seven were in operation. Two of these turbines were dedicated to generating the 25 Hz single-phase power required to feed the Pennsylvania Railroad’s newly electrified railroad. By 1938, the final phases of the electrification were complete and included the A&S, Port Road, Columbia Branch and Main Line west to Harrisburg. With the eastern main line and freight network complete, power from Safe Harbor began supplying the PRR grid, with tethers of high voltage transmission lines mounted above the tracks, feeding various substations along the PRR’s electrified territory. The railroad understood the value of the Public Works project and the advantage of a renewable energy source. Today Safe Harbor operates 12 turbine generator units and continues to supply the Northeast passenger rail network today.

View from the Port Road looking to the South. There is a passing siding here that ends just to the north of the Conestoga Bridge, giving the appearance of double track. Most of the Port Road south is single track with passing sidings. The A&S Bridge stands silent today, with no rail activity since 1988.

View from the Port Road looking to the South. There is a passing siding here that ends just to the north of the Conestoga Bridge, giving the appearance of double track. Most of the Port Road south is single track with passing sidings. The A&S Bridge stands silent today, with no rail activity since 1988.

Turkey Hill

View of Turkey Hill from the north, near Creswell Station, PA.  Turkey Hill, a prominent feature in the local geography along the Susquehanna River became a household name as a result of a resourceful dairy farmer during the Great Depression. Situated on the east side of the Susquehanna River in Manor Township, the hill rises roughly 500 feet above the valley floor. Both the Columbia & Port Deposit and Atglen & Susquehanna routes of the Pennsylvania Railroad make there way around the western face as they move east toward Conestoga Creek at Safe Harbor.

View of Turkey Hill from the north, near Creswell Station, PA. Turkey Hill, a prominent feature in the local geography along the Susquehanna River became a household name as a result of a resourceful dairy farmer during the Great Depression. Situated on the east side of the Susquehanna River in Manor Township, the hill rises roughly 500 feet above the valley floor. Both the Columbia & Port Deposit and Atglen & Susquehanna routes of the Pennsylvania Railroad make there way around the western face as they move east toward Conestoga Creek at Safe Harbor.

Detail of a 1912 USGS topographical map of the McCalls Ferry Quadrangle. Notice the distinct notch that Turkey Hill creates off the eastern shore of the Susquehanna River. Collection of  Mytopo.com

Detail of a 1912 USGS topographical map of the McCalls Ferry Quadrangle. Notice the distinct notch that Turkey Hill creates off the eastern shore of the Susquehanna River. Collection of Mytopo.com

The name of the family owned Turkey Hill based dairy business dates back several generations to Armor Frey during the Great Depression. Starting as a small supplement to make ends meet, Frey built his dairy route into a profitable company, with his sons taking over in 1947. It wasn’t until the 1980's however that the name Turkey Hill made it into most of our lives when the Frey family made a considerable investment in growing their ice cream production. By 1981 independent markets in the Philadelphia area picked up the product line and soon after Turkey Hill would be one of America’s best-known dairies.

The former A&S right of way climbing toward Turkey Hill is one of two lines that round the point at different elevations. The Columbia and Port Deposit is at a lower elevation to the right, along the Susquehanna’s east bank. Note the wind turbine in the distance, the absence of the fan blade is due to the longer exposure while the turbine was in motion.

The former A&S right of way climbing toward Turkey Hill is one of two lines that round the point at different elevations. The Columbia and Port Deposit is at a lower elevation to the right, along the Susquehanna’s east bank. Note the wind turbine in the distance, the absence of the fan blade is due to the longer exposure while the turbine was in motion.

The forward thinking company installed two wind turbines on Turkey Hill in 2010 to provide up to 7.2 kWh or 25% of their facility’s power demands. The towers stand at 262 feet and are the tallest structures in Lancaster County. Ironically the same bluff that Armor Frey allegedly watched the sunrise from everyday before going to work is part of Lancaster County’s Frey Farm Landfill site, a massive facility that handles Lancaster County’s waste that cannot be converted to energy or recycled. While the facility is considerable in size, they have taken great measure to preserve the environmental integrity of the areas rich with wildlife and ornithological diversity. Currently Lancaster County is developing a walk in park and hiking trails to enjoy the breathtaking view from atop of Turkey Hill. Though I have yet to explore this particular location, you can be certain that I will report back with images from this prominent scenic viewpoint!

Susquehanna Reprise

Approaching thunderstorm and Hill Island from the east bank, Royalton, Pennsylvania.

Approaching thunderstorm and Hill Island from the east bank, Royalton, Pennsylvania.

Though we've discussed the trials and tribulations the Pennsylvania Railroad endured sharing the banks of the Susquehanna River, particularly on the Columbia and York Haven lines, I would like to take a chance to celebrate the river itself. The Susquehanna runs approximately 464 miles from the uplands of New York and Western Pennsylvania to create the longest river on the east coast to drain into the Atlantic Ocean. The river's watershed drains some 27,500 square miles encompassing nearly half of the State of Pennsylvania. The broad shallow river winds a wandering course to the mouth of the Chesapeake Bay at Harve De Grace, Maryland. Through various routes including the mainline, York Haven, Port Road and Northern Central the PRR follows considerable lengths of the Susquehanna. In particular, for this post at least, we celebrate some of the natural beauty of the mighty river in context of Lancaster County and the PRR York Haven and Columbia branch. Enjoy!

Clearing fog, Roundtop Mountain, from the mouth of Chiques Creek. Marietta, Pennsylvania 

Clearing fog, Roundtop Mountain, from the mouth of Chiques Creek. Marietta, Pennsylvania 

Confluence of Chiques Creek and the Susquehanna, framed by the York Haven Line Bridge. Marietta, Pennsylvania

Confluence of Chiques Creek and the Susquehanna, framed by the York Haven Line Bridge. Marietta, Pennsylvania

Mooring posts and Turkey Hill Point, Washington Boro, Pennsylvania.

Mooring posts and Turkey Hill Point, Washington Boro, Pennsylvania.