Lancaster Terminal: The Old Main

Postcard view of the ornate Victorian styled PRR station located at N. Queen and E. Chestnut Streets in the city of Lancaster. Collection of the author. 

Postcard view of the ornate Victorian styled PRR station located at N. Queen and E. Chestnut Streets in the city of Lancaster. Collection of the author. 

Lancaster Old Main: The original main line of the Pennsylvania Railroad made a gentle southern arc from the area of Dillerville in the northwest corner of the city limits to where it crossed the Conestoga in the northeast, intersecting busy streets through the growing city of Lancaster. The line was the combination of routes built by the Philadelphia & Columbia (P&C) and Harrisburg & Lancaster (H&L) railroads. The P&C, part of the state built Main Line of Public Works, was a through route connecting Philadelphia to the east and Columbia to the west. The H&L was an early private venture that terminated in Lancaster connecting the P&C via its own main line directly to Elizabethtown and Harrisburg. Shortly after the charter and beginning of construction on the main line between Harrisburg and Pittsburgh the PRR contracted a 20-year agreement with the H&L in 1848, part of an effort to secure a direct route to Philadelphia. J. Edgar Thompson would accomplished this goal when the PRR finally assumed operations of the P&C in 1857, part of its $7.5 million purchase of the Main Line of Public Works. With the reorganization of both lines into the PRR, traffic patterns west from Lancaster evolved to a pattern familiar to contemporary operations with passenger trains favoring the more direct H&L and the P&C for freight traffic.

1912 map detail showing the congested area surrounding the original alignment of the Philadelphia and Columbia route which became the PRR's original main line through Lancaster. The station was located at Queen and Chestnut Streets (location 25 on the map) and the freight terminal was on the corner of Prince and Walnut Streets (upper left from station). Map collection of the Penn State University Library

1912 map detail showing the congested area surrounding the original alignment of the Philadelphia and Columbia route which became the PRR's original main line through Lancaster. The station was located at Queen and Chestnut Streets (location 25 on the map) and the freight terminal was on the corner of Prince and Walnut Streets (upper left from station). Map collection of the Penn State University Library

After the PRR purchased the P&C it immediately took initiatives to replace primitive station facilities run out of a local inn. The result was a beautiful train shed and station built between Queen and North Christian Streets parallel to Chestnut Street. While a drastic improvement from previous arrangements it would prove to be a stopgap measurement for the fast growing railroad. Larger operational issues existed to the west of the station in a maze of trackage servicing both PRR owned freight houses and numerous industries most of which was at grade with the city streets. Adding to the congestion was the connection to the Quarryville Branch and interchange with the Reading Company’s R&C Division all within the city limits.

Images detailing both the freight terminal and industrial tracks the spurred off the main line (left) and the western view from the passenger station shed looking out on the crossing of N. Queen Street. These images reinforce the complicated and dangerous operating conditions the city and railroad faced on a daily basis. Both images courtesy of LancasterHistory.org, Lancaster, Pennsylvania

Images detailing both the freight terminal and industrial tracks the spurred off the main line (left) and the western view from the passenger station shed looking out on the crossing of N. Queen Street. These images reinforce the complicated and dangerous operating conditions the city and railroad faced on a daily basis. Both images courtesy of LancasterHistory.org, Lancaster, Pennsylvania

Serving as the sole through route into the 1880’s the PRR addressed the limitations of the Old Main by constructing a bypass known as the Lancaster Cut-Off. After the 1883 opening of this new route only trains serving Lancaster navigated the city route. Despite the growth and increasing need for more rail transportation the unfortunate reality was the mighty PRR was diverting more and more trains away from the Queen Street station in favor of the new by-pass. The net result meant mounting political pressure on the PRR from city government to provide residents and visitors improved rail transportation, an issue  that would continue well into the 1920’s. This era marks the beginning of an effort of urban renewal that continues to change how people and the railroads interface with the city of Lancaster. In future posts we will continue the discussion of how and when the PRR diverted operations away from the Old Main and how successors have continued to revise and improve local facilities and operations.